Decoration construction design description

2022-07-22
  • Detail

1、 Design basis: 1. According to the rooms used in the studio designated by Party A, the confirmed plane layout and relevant plans, renderings and other data. 2. National design specifications and regulations for building decoration engineering of TV studios II. Design scale and scope: 1 the decoration project is the studio of Zhuanglang County Radio and Television Bureau. 2. This decoration project is designed for the decoration of multi-function room. 3、 Design elevation and positioning and others: 1. The design relative elevation of this decoration project +0.000 building

I. design basis:

1 according to the room used in the studio designated by Party A, the confirmed plane layout and relevant plans, renderings and other data

2 national design specifications and procedures for building decoration engineering of TV studios

II. Design scale and scope:

1 this decoration engineering is the studio of Zhuanglang County Radio and Television Bureau

2 this decoration project is designed for the decoration of multi-function room

III. design elevation and positioning and others:

1 the design relative elevation of this decoration project +0.000 building decoration completion elevation, relative to the original building elevation, according to the corresponding improvement of ground decoration materials, the positioning is detailed in the construction drawings of each part

2 the dimensions of the design elevation and detail drawing of this decoration project are the dimensions of the finished surface. If there are small differences on site, they can be adjusted appropriately

3 the main dimensions marked in the design of this decoration project are in millimeters, and the elevation is in meters

IV. fire protection requirements:

1 according to the requirements of the code for fire protection design of buildings, non combustible materials and non combustible materials are actively used in the design of this decoration project

2 the surface of all concealed wood structures must be painted with class I decorative fireproof paint. The surface of inflammables shall be treated with flame retardant exterior treatment

3 except for some contradictory adjustment positions in the indoor design, the smoke alarm system, conventional fire protection system and automatic sprinkler system retain the original fire protection design

v. moisture proof, rust proof, noise elimination and sound insulation treatment:

1 to prevent moisture intrusion from causing deformation and corrosion of wood structures, paint asphalt paint when necessary

2 the steel structure surface needs red lead rust proof paint for treatment, and galvanized parts are selected for bolts, nuts, washers, etc

3 fill sound-absorbing cotton in the space of wooden grating to ensure the effect of sound absorption and sound insulation

VI. equipment installation:

1 heavy lamps need to be suspended on the top plate temporarily, and cannot be connected with the ceiling keel.

2 light lamps and other lamps can be suspended on the main keel of the ceiling, but they must be reinforced.

3 other equipment installation should ensure the decoration effect, because they avoid the air outlet, spraying, smoke, etc

VII. Wall works:

1 in the construction drawing of this design, the wall should pay attention to sound insulation and silencing

2 during the construction of microporous aluminum plate on the wall, the installation position of wood keel and light steel keel is accurate, the connection is firm without looseness, the sound insulation cotton is placed appropriately, the keel is selected correctly and meets the product requirements

3 the surface of microporous aluminum plate is flat and clean, and the position of the sleeve cutting electrical box is accurate, and the sleeve cutting is flat

4 the joint of microporous aluminum plate is uniform, straight and in line with relevant regulations. It is tightly combined with the keel

5 during the construction of aluminum-plastic panel and red walnut decorative panel on the wall, the wooden keel and position shall be accurate, the connection shall be firm without looseness, the high-density board shall be flat, the nail cap shall not be exposed, it shall be placed appropriately, the sound insulation cotton shall be fixed, and attention shall be paid to the blank. Select the keel correctly and meet the product requirements

6 during the construction of aluminum-plastic plate and red walnut veneer on the wall, the joints shall be flat and straight, the direction of wood grain shall be consistent, the direction of plastic aluminum plate shall be consistent, and attention shall be paid to the protection of the finished surface

7 all wood varieties shall be selected, and the grade, quality and moisture content of the skeleton must comply with the relevant provisions of the code for construction and acceptance of forest structures and gbj206-831, as well as the relevant provisions on fire prevention in the decoration design of architects

8 microporous aluminum plate and red walnut board. The position of the sleeve cutting electrical box shall be accurate and the sleeve cutting shall be smooth

VIII. Ground engineering:

1 the surface of the carpet laying base must be flat, smooth, dry, dense and clean. There shall be no cracks, peeling and sanding

2 the carpet should be nailed to the floor, the rubber pad should be flat, and attention should be paid to the joint should meet the relevant provisions, and attention should be paid to the protection of the finished surface

IX. coating works:

1. The base must have a flat surface, vertical elevation, flat joints, square corners and accurate dimensions

2 the quality requirements of the part on the surface of the coating is based on the plastering. The plastering meets the high-level plastering standard. The grey surface has the same color, the surface is flat, the internal and external corners are straight, and the size is accurate

3 the paint selected for this project is a special paint, and the number of times of painting shall be subject to the requirements of the supplier

4 the brushing thickness and color are consistent, and the brushing surface is clean and pollution-free

5 during the construction of paint works, the temperature shall not be lower than 10 ℃, and the relative humidity shall not be greater than 60%

6 when painting, the surface shall be fully dry, and each paint construction shall be carried out after the previous paint is dry

7 when painting, it should be horizontal and vertical, crisscross and uniform. It should be noted that the forest lines are clear, and no missing painting, peeling marks, sagging and wrinkle are allowed. Smooth and unstoppable feel, consistent color, no brush pattern

X. construction precautions:

1 the current national construction and acceptance specifications should be strictly implemented during construction.

2 the design drawings and material selection should not be changed arbitrarily. If changes are necessary, the designer can be contacted in time according to the requirements of the construction party

3 coordination and solution: the parts not detailed in the drawing shall be coordinated by the designer on site

4 in order to ensure the design effect, the material selection of important materials must be in accordance with the design requirements, and the requirements of relevant fire prevention specifications must be strictly observed during the construction. Concealed works can be closed only after passing the acceptance of Party A

5 in order to facilitate the construction, under the condition of ensuring the same decorative effect, the internal practice can be adjusted appropriately according to the common practice, but it must be safe and reliable